The Harford Road Bridge contractor has placed the base pavement for most of the area south of the bridge. They continue to remove trolley tracks and prepare the subgrade for pavement up to Chesterfield Ave.

The Contractor is placing the utilities under the bridge then will begin placing the parapets.

On the south side, the contractor has installed temporary drainage basins next to the MSE retaining wall.