The Harford Road Bridge contractor has set all the precast bridge panels. Base pavement has been placed on the north side of the bridge along with curb and gutter.

The contractor continues to place concrete on the deck to lock in the precast panels and place the sidewalk.

On the south side of the bridge they are grading the slopes and placing subgrade below the roadway.